Project: Yellow River Grand Bridge
Fiber Type: Copper/Brass Coated Steel Fibers for UHPC
Project Description: The Yellow River Bridge is currently the bridge with the largest span across the Yellow River. The weight of the main beam pushed out exceeds 27,000 tons, creating the highest push-out construction record for the Yellow River composite beam cable-stayed bridge. The main beam uses UHPC ultra-high performance concrete precast bridge deck design, which is the first time in China.
Contact: Kevin
Phone: +86 17727969732
E-mail: kevin@hyperionmaterial.com
Whatsapp: +8617727969732
Add: Block R2-B, Gaoxin South Road, Gaoxin Community, Yuehai Street, Nanshan District, Shenzhen
We chat