Projects

Project: Yellow River Grand Bridge

Fiber Type: Copper/Brass Coated Steel Fibers for UHPC

Project Description: The Yellow River Bridge is currently the bridge with the largest span across the Yellow River. The weight of the main beam pushed out exceeds 27,000 tons, creating the highest push-out construction record for the Yellow River composite beam cable-stayed bridge. The main beam uses UHPC ultra-high performance concrete precast bridge deck design, which is the first time in China.

CATEGORIES

CONTACT US

Contact: Kevin

Phone: +86 15013546391

E-mail: kevin@hyperionmaterial.com

Whatsapp: ++86 15013546391

Add: North Industrial Base, Hi-Tech Zone, Hengshui City, Hebei Province, China