Projects

Project: Yellow River Grand Bridge

Fiber Type: Copper/Brass Coated Steel Fibers for UHPC

Project Description: The Yellow River Bridge is currently the bridge with the largest span across the Yellow River. The weight of the main beam pushed out exceeds 27,000 tons, creating the highest push-out construction record for the Yellow River composite beam cable-stayed bridge. The main beam uses UHPC ultra-high performance concrete precast bridge deck design, which is the first time in China.

CATEGORIES

CONTACT US

Contact: Kevin

Phone: +86 17727969732

E-mail: kevin@hyperionmaterial.com

Whatsapp: +8617727969732

Add: Block R2-B, Gaoxin South Road, Gaoxin Community, Yuehai Street, Nanshan District, Shenzhen